CHEMICAL
MANUFACTURING PLANT

BRISBANE, QLD

PSK completed a detailed Stage 2 Contaminated Land Investigation at a 4 ha manufacturing plant in South East Queensland aimed at identifying soil contamination requiring remediation. PSK was also commissioned to undertake remediation of portions of the site and to conduct an annual Groundwater Quality Monitoring Event to meet permit conditions.

PSK was also commissioned to undertake further Stage 2 contaminated land investigations on one of the Lots to gather sufficient data to enable submission to the Department of Environment and Sciences (DES) for the removal of the Lot from the State’s Environmental Management Register (EMR).